Customization: | Available |
---|---|
Material: | Plastic |
Entertainment Projects: | Slide,Ball Pool,Trampoline,Bridge |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1, plastic parts: | Imported engineering plastics, infiltration of anti-ultraviolet, anti-static decolorization element passing, strength, smooth surface, security assurances, weather resistance, not easily fade. |
2, column: | The national standard 114mm diameter steel pipe, column footing plate screw with a pull-burst, the surface rust, acid degreasing, cleaning, phosphating rust after a special process, throwing sand, imported plastic powder with a double surface household-level spraying layer, electrostatic spray, high- temperature plastic 200 degree baking powder, smooth surface, UV, colorful, easy to fall off. |
3, platform: | High strength punching plate, with a special process dealing with wavy surface microscopy, safe and beautiful non-slip resistance. |
4, fastener: |
Stainless steel screws used Lvkou pieces, and the contact point deduction and the columns to be rubber pads, and machine-processed rice tighten the screw, screw top cover with a plastic cap, but enhance its security. |
hundreds of items are for you choose | |
Certificates | ISO9001, CE, RoHS |
Age Range | 3--15 ages |
Minimum order quantity | 1 SET/20FCL(28cbm) |
Material | A. Plastic parts: Imported LLDPE from Korea.. |
B. Post: National standard galvanized steel pipe with powder coating | |
C. Platform, stair, bridge: National standard galvanized steel plate with powder coating or rubber | |
Capacity | 50m2 about 25-40 children; |
50-100m2 about 40-70 children; | |
100-200m2 about 70-120 children | |
Usage: | Pre-school,amusement park,garden,shopping mall,public,places etc. |
Installation | Professional CAD instruction ,assembly procedure and project case |
Packing | Standard export packing, cotton and nylon |
Advantages | All the elements are anti-crack, anti-fa receivedde, anti-toxic, anti-UV resistance. |
Payment Terms: | 30% as deposit, and balance before shipment |
Product leadtime | 10-15 days from the deposit |